Well, the basic Mk II configuration seems to have changed a bit with the GS2 already containing 40 tons of propellant in both of its flights (D3 and D5). The MkIIA configuration will have payload fairing which will be 4m in diameter. The CUS with 15 tons of propellant is said generate 90kN of thrust against 75kN of the current engine (although it can be already throttled above 75kN but not to 90kN).
Showing posts with label PSLV. Show all posts
Showing posts with label PSLV. Show all posts
Monday, January 13, 2014
Some interesting tidbits!
Well, the basic Mk II configuration seems to have changed a bit with the GS2 already containing 40 tons of propellant in both of its flights (D3 and D5). The MkIIA configuration will have payload fairing which will be 4m in diameter. The CUS with 15 tons of propellant is said generate 90kN of thrust against 75kN of the current engine (although it can be already throttled above 75kN but not to 90kN).
Thursday, May 2, 2013
Martians! Here we come!
The Mars mission, India's first ever to a distant planet was announced by our Prime Minister Dr. Manmohan Singh during India's 66th Independence Day celebrations. This was to be a considerable challenge to our burgeoning space program considering the fact that even countries with established space programs such as the Russia Federation have found it difficult to achieve much success when it comes to the red planet.
But ISRO on the other hand has things going right for them on the deep space exploration side of the things. Buoyed by the success of Chandrayaan 1 and the impeding launch of Chandrayaan 2 missions to our moon, the scientists at ISRO are confident of achieving yet another feat with Mars mission.
The mission itself has always been short of details except for the occasional new reports saying that the orbiter is on schedule for a 2014 launch. Every piece of information that can be found on this mission is indeed valuable. There are certain titbits from mission that we would like to share.
- The Mars orbiter will be placed in an elliptical orbit of around 500 X 80,000 km around the red planet. It is much more difficult to put an orbiter into a circular orbit. A circular orbit requirement would require a significant increase in the fuel carried by the orbiter and hence its weight. It would also make the procedure of achieving the required orbit much more complex. The orbiter would first be inserted into an elliptical orbit. Then through a series of burns the apoapsis would need to be reduced to achieve a circular orbit. An elliptical orbit on the other hand reduces the complexity but doesn't make it any more easier to achieve.
- The orbiter will be launch by the PSLV-XL, the same version which launched the Chandrayaan 1. ISRO understandably wants to go with the proven workhorse as opposed to the GSLV even if it means much stringent weight limitations of the orbiter. This might also be one of the reasons for choosing an elliptical orbit as a circular orbit means more fuel which in turn means more weight. The PSLV should be capable of sending a orbiter with ~200 kg of space for instruments to the Martian orbit.
- The orbiter would need around 300 days to reach Mars and is supposed be launched during October-November 2013. The launch window is very important since missions to Mars can be launched when Earth and Mars are relatively close to each other. This window occurs only once every 26 months. So, miss this window and the mission will have to wait for another 2 years.
- The orbiter is supposed to carry very few instruments, considering the weight limitations and all the instruments are planned to be Indian. The goal of the mission to establish the capability to send orbiters to Mars, so if this mission is successful much bigger missions may follow.
- The spacecraft needs shielding from the radiation in the Van Allen belt and also the deep space radiation. The spacecraft will have a significant and prolonged exposure to radiation so it needs augmented radiation shielding.
- There is a communication delay of ~20 mins between Earth and Mars. This is due to enormous distance that varies between 55-385 million kms between the two bodies. Compare this with the 2 second communication delay between the Earth and the Moon which are separated by 384,000 kms.
- The propulsion system of the spacecraft needs to be robust and reliable. The spacecraft propulsion system will remain dormant for almost 300 days when the spacecraft is travelling from Earth to Mars. Then once it is close to Mars, the propulsion system has to work exactly as it should to insert the spacecraft into orbit around Mars.
- The most challenging phase is certainly inserting the spacecraft into orbit around Mars. The room for error in this phase is minimal and could result in the spacecraft being lost in the depths of space. This critical event will ensure whether the mission is a success.
Labels:
Deep Space Exploration,
Martian mission,
PSLV
Sunday, July 17, 2011
PSLV notches up another success
The PSLV has added another success in it's list after than the successful launch of the GSAT-12A on-board the PSLV-C17. This was the PSLV's 19th flight and it's 15th consecutive successful launch. The satellite was launched into a sub geostationary transfer orbit.
The 53 hour countdown started at 11:48 hours (IST) on July 13, 2011. ISRO has been generous enough to provide us with videos of launch vehicle integration which happened during the months and weeks leading upto the launch.
The integration of Solid rocket boosters with first stage. Credit:ISRO
Integration of the third and fourth stages. Credit:ISRO
Integration of the satellite and heat shield. Credit:ISRO
The GSAT-12A itself is a communications satellite of the INSAT-family, a replacement for the INSAT-3B. It was launched to address the ever-growing demand for transponders. This particular satellite carries 12 C-band transponders.
The launch window for this flight opened at 16:48 hours for 20 minutes. The weather was gloomy but there was no rain leading-up to the launch. The mission director gave the go-ahead for the launch at the scheduled launch time (16:48 hours IST). During the last 15 minutes, the onboard mission computer takes over the launch control. It is also important to mention that this particular flight was the first PSLV flight with the indigenous flight computer Vikram (which was previously used on the GSLV-D3 flight).
Due to this being a launch to sub-GTO orbit, the normal flight profile of the PSLV was altered slightly to obtain the large apogee. The configuration used here was the PSLV-XL with 13.5 meter long strap on solid boosters that each carried nearly 12 tonnes of propellant instead of the standard version were they are 11.3 meters long and carry 9 tonnes of propellant. At liftoff the vehicle stood 44 meters tall and weighed about 320 tonnes.
The altered fight profile meant that the fourth stage coasted for 2 minutes 25 seconds before ignition and fired for about 9 minutes. After about 20 minutes of the flight, the satellite was inserted into a sub-Geosynchronous Transfer Orbit (sub-GTO) with a perigee of 284 km and an apogee of 21,020 km with an orbital inclination of 17.9 deg. This was almost equal to the planned 284 km perigee and 21,000 km apogee orbit.
The satellite will be placed into Geostationary orbit by firing of it's onboard thrusters during the coming weeks.
Flight Brochure: Link
Image Gallery: Link
Thursday, July 8, 2010
PICTURES: Indian Space Transportation System - Present Scenario and Future Directions
The presentation titled 'Indian Space Transportation System - Present Scenarion and Future Directions' presented by Dr. B.N.Suresh on 19th June, 2009 at TIFR, Mumbai. Credit:ISRO Click on the slideshow for larger images.
Important Observations:
- Slide 20 gives us an idea of the Indian interplanetary missions on the drawing board. The slide also gives the orbital and fly-by payload capacities of PSLV, GSLV and GSLV -Mk III to Mars, Venus and Asteroid (very vague definition in this case) respectively. The approximate date for robotic missions to Venus and asteroids is mentioned in Slide 34 as 2018 (Interplanetary missions beyond Mars). The Martian mission according to ISRO will take place only after 2015.
- Slide 20 mentions the performance specifications of GSLV-Mk III i.e 4.5 tons to GTO and 10 tons to 400 km LEO. In addition it clearly specifies the growth potential to as 5 to 6 tons to GTO, a previously speculated figure. Slide 14 illustrates the flight sequence of Mk III.
- Slide 25-Slide 28 gives some information of the RLV program. Slide 25 is the image of RLV-TD. Slide 26 shows the RLV with an air-breathing engine. Slides 27 and 28 shows the configuration and flight profile of an RLV-TSTO (Two Stage to Orbit) version.
- Slides 29-33 has information regarding the Indian Human Spaceflight Programme. The slides give information about the crew vehicle and the human-rated GSLV that would launch it and the mission profile. Slide 33 has already been discussed in detail in an earlier post.
Tuesday, May 11, 2010
PSLV variants

Extract from Evolution of Indian launch vehicle technologies published in CURRENT SCIENCE, VOL. 93, NO. 12, 25 DECEMBER 2007PSLV was designed in 1980s for inserting 1 ton class of operational remote sensing satellites into Sun synchronous orbit. It was truly a quantum leap for Indian space technology at that time as a follow-on project of the ASLV. PSLV today is among the few launchers with a very high success rates and serves as the work-horse of ISRO.
Different configurations are designed to provide wide variations in payload capabilities ranging from 600 kg in LEO to 1900 kg in SSPO. Core-alone configuration without strap-on motors is designed to launch two satellites of 400 kg each into LEO. A three-stage configuration without strap-on motors and liquid stage will offer lower launch cost of 500 kg class of satellites into LEO.
The most interesting of these variants are the PSLV-HP and PSLV-3S, the most capable and least capable members of the PSLV family if built. The PSLV-HP is supposed to have a a capability of 1900 kg to SSPO. It was designed to launch the IRNSS constellation into orbit but there are doubts over the program following the revelation by ISRO that it was looking into the possibility of GSLV launching the IRNSS. The 3S variant without the PSLV second stage is designed to launch 500 kg payload into a 550 km LEO.
Subscribe to:
Posts (Atom)
























