Showing posts with label Indian Lunar Exploration Program. Show all posts
Showing posts with label Indian Lunar Exploration Program. Show all posts

Monday, August 9, 2010

Indian Delegation in Russia



Signing of an agreement on cooperation in space exploration between chairman of ISRO, Dr. K Radhakrishnan and head of ROSCOSMOS, Antony Perminov on August 4th in Moscow.


Thursday, July 8, 2010

PICTURES: Indian Space Transportation System - Present Scenario and Future Directions


The presentation titled 'Indian Space Transportation System - Present Scenarion and Future Directions' presented by Dr. B.N.Suresh on 19th June, 2009 at TIFR, Mumbai. Credit:ISRO Click on the slideshow for larger images.

Important Observations:
  • Slide 20 gives us an idea of the Indian interplanetary missions on the drawing board. The slide also gives the orbital and fly-by payload capacities of PSLV, GSLV and GSLV -Mk III to Mars, Venus and Asteroid (very vague definition in this case) respectively. The approximate date for robotic missions to Venus and asteroids is mentioned in Slide 34 as 2018 (Interplanetary missions beyond Mars). The Martian mission according to ISRO will take place only after 2015.
  • Slide 20 mentions the performance specifications of GSLV-Mk III i.e 4.5 tons to GTO and 10 tons to 400 km LEO. In addition it clearly specifies the growth potential to as 5 to 6 tons to GTO, a previously speculated figure. Slide 14 illustrates the flight sequence of Mk III.
  • Slide 25-Slide 28 gives some information of the RLV program. Slide 25 is the image of RLV-TD. Slide 26 shows the RLV with an air-breathing engine. Slides 27 and 28 shows the configuration and flight profile of an RLV-TSTO (Two Stage to Orbit) version.
  • Slides 29-33 has information regarding the Indian Human Spaceflight Programme. The slides give information about the crew vehicle and the human-rated GSLV that would launch it and the mission profile. Slide 33 has already been discussed in detail in an earlier post.

Sunday, July 4, 2010

ISRO Heavy Lift Vehicle

A slide for Dr. B N Suresh's presentation titled 'Indian Space Transportation System: Present Scenario and Future Directions' at TIFR-Mumbai, 19th June 2009 Credit:ISRO

In an earlier post Super Nova had reported on the preliminary concept of an Indian Lunar manned mission presented at IAC-2009. That concept envisaged the development of a crew launch vehicle and a Cargo Launch Vehicle with payload capabilities of 31 and 84 tons respectively to Low Earth Orbit.

The above image shows another concept Heavy Lift Vehicle (HLV) which would be able to haul 100 tons to LEO. What is interesting in this architecture is that no solid stages would be used on the vehicle. 4 SC460 Semi-cryogenic boosters with the SC800 first stage would generate the lift-off thrust for the vehicle. The C100 upper stage would probably serve as an Earth Departure stage (EDS) .

In addition to the HLV, the presentation slide also gives us an idea of the role that the GSLV-Mk III would play in lead up to Lunar manned mission and more importantly in the Indian Human Spaceflight Program.

As we know the present Human Spaceflight concept envisages the development of a crew capsule (Orbital Vehicle) which would be launched by the GSLV-Mk II. This capsule would probably not feature any docking system due to restriction in the payload capacity of GSLV-Mk II (around 5 tons).

Given the greater capability of Mk-III, ISRO plans to use the vehicle to launch a bigger, better equipped crew capsule which would be use to demonstrate rendezvous and docking in addition Extra Vehicular Activity (EVA).

Thursday, February 25, 2010

Indian Moon Rockets: First Look

The Preliminary Lunar Manned Mission Concept (Right) showing the launch vehicle architecture. Credit: ISRO

Back in December, Supernova posted the presentation by ISRO at the IAC 2009. A very less known and highly ambitious part of that presentation was the preliminary concept of an Indian Lunar manned mission. The concept in itself is not very detailed but gives us an insight into what ISRO has in store for the future. More importantly, the concept showcases the future UMLV family (Unified Modular Launch Vehicle) being used to loft the crew vehicle. This is the first time that we have had any insight into the possible architecture of the UMLV family, which will be powered by a Common Liquid Core stage in development.

The first thing that strikes when we look at the preliminary lunar concept are the 2 majestic launch vehicles. These launch vehicles, especially the one that launches the Earth Departure Stage (EDS), is a world beyond the capabilities that India possesses today.

ISRO plans to use two rockets for the manned lunar mission. The first will be a crew launch vehicle with the capability to launch 31 tons to Low Earth orbit. This vehicle with a liftoff weight of 1690 tons, would launch the crew module and the service module.

The second rocket will launch the Earth Departing Stage and the Lunar Descent module. This launch vehicle would be a true Super-heavy lifter with a capability to launch 84 tons into Low Earth orbit. The liftoff weight of this beast would 3075 tons.

ISRO has also given some of the technical details about the launch vehicles. The basis for these launch vehicles (as that of the UMLV family) is the new 2ooo kN Semi-cryogenic engine in development. The architecture of the two vehicles would be :

Crew Launch Vehicle
* Architecture - 4 S230 + SC500 + C60
* Capability - 31 tons to Low Earth Orbit
* Payload - Crew Module (6 tons) + Service Module (25 tons)

Carge Launch Vehicle
* Architecture - 8 S230 + SC800 + C60
* Capability - 84 tons to Low Earth Orbit
* Payload - Earth Departure Stage (67 tons) + Lunar Descent Module (17 tons)

The S230 would be solid boosters with 230 tons of propellants, future descendants of the S200 booster developed for the GSLV-Mk III. The SC500 and SC800 stages would be powered by the Semi-cryogenic engine and containing 500 and 800 tons of propellant respectively. The C60 would be the bleeder expander cycle upper cryogenic stage containing 60 tons of propellant.

The modular architecture of the launch vehicles and that of the whole UMLV family would help in reducing the cost of the rockets. The lunar architecture itself seems to be loosely based on the Constellation Program (which is supposed to be axed this year) architecture.

ISRO is pressing ahead with it's preliminary research on Lunar manned mission irrespective of prospective financial issues of such a high budget mission although the the program itself in full isn't expected to be started anytime before 2020.

Will be back with some analysis on the other part of mission ie beyond the launch vehicles.